Works Department
Works Department
 
Works Department
 
 Research Development & Quality Promotion Wing
SOIL TESTING CHARGES CHARGED BY RDQP, Odisha
Sl. No. Name of the Test Unit Testing Charges in Rs. Remarks
1.1 Determination of Moisture Content dry density relation using Light Comapction (I.S.2720-Pt.VII). Per Test 621.00
1.2 Determination of Moisture Content dry density relation using Heavy Comapction (I.S.2720-Pt.VII). Per Test 630.00
1.3 Laboratory Determination of C.B.R.(Disturbed sample)(I.S.2720-Pt.XVI). Per Test 473.00 Excluding compaction test charges
1.4 Laboratory Determination of C.B.R.(Undisturbed sample)(I.S.2720-Pt.XVI). Per Test 315.00 Excluding charges of collection of samples.
1.5 Field Determination of C.B.R.(I.S.2720-Pt.XXXI). Per Test 280.00 Charges towards travelling allowance carriages & vehicles are separate.
1.6 Determination of Liquid and Plastic Limit (I.S.2720-Pt.V) by Mechanical Liquid Limit device. Per Test 551.00
1.7 Determination of Liquid and Plastic Limit (I.S.2720-Pt.V) (by Cone Penetrometer). Per Test 280.00
1.8 Grain size analysis (I.S.2720-Pt.IV) by Sieve Per Test 411.00
Works Department
Disclaimer     |     Terms & Conditions     |     Contact Us     |     Admin
 
Works Department
Works Department